Home/ Power/ United States/ Dominion Energy

Dominion Energy

⚠ Beta: figures still being verified

Parent group (Global Energy Monitor): Dominion Energy Inc · years are calendar years ⓘ

32.9 Mt
Scope 1 emissions, 2025 ⓘ
0.32
t CO₂-e/MWh sent out, 2025 ⓘ
59
Plants reporting in 2025
13%
covered by planned retirement dates
Basis:
ⓘ How projections work
Show data table
Projection (equity share) Mt CO₂-e, 2026 to 2050
Planned retirements (EIA, else GEM) 682
Closures 5 years late 701
No closures 756

How others report it

Not directly comparable: different boundaries and methods. Shown for context only. Our figures use the same method for every company (EPA eGRID; 2024–25 estimated plants, sent out); company reports may add contracted generation, Scope 2 or other boundaries.

SourceBoundary20212022202320242025
Emissions vs Climate TRACE (Mt CO₂-e)
Open AssetsScope 1, equity share, plants in both datasets31.130.026.730.9–
Climate TRACE (modelled)Same plants and equity shares as ours35.434.529.731.0–

Why Climate TRACE differs. Climate TRACE models each plant's generation from satellite and grid data and applies standard emission factors; our figures are what plants report to the regulator (EPA eGRID; 2024–25 estimated). To compare like with like, Climate TRACE plants are matched to ours and given the same equity shares, so the gap is Climate TRACE's modelling, not ownership. In our tests about half of the plant-level gap comes from generation estimates and half from emission factors (in Australia Climate TRACE's factors are too high for black coal and too low for brown coal). Company totals can look close while single plants are well off, because the errors offset.

Largest plant gaps, 2024: Virginia City Hybrid Energy Center: +1.1 Mt (+106%; generation +111%, emissions per MWh -2%); Gravel Neck Combustion Turbine: +0.5 Mt (+550%; generation +964%, emissions per MWh -39%); Brunswick County Power Station: -0.5 Mt (-13%; generation +2%, emissions per MWh -15%).

Company target

Net zero Scope 1+2+3 by 2050 not drawn ⚠ caveat Oxford Net Zero Tracker, snapshot 20 Jan 2026

Plants and closure dates ⓘ

Methodology →
Fossil plants closing
5 plants · 4.6 Mt
Fossil, no closure date
19 plants · 29.2 Mt
Renewables with end-of-life date
0 plants
Plant Fuel Mt CO₂-e TWh Trend Closure Status
No longer reporting under this company
Closure: ≤2030 · 2031-40 · later · ↻ date moved · click a row for annual figures
+ 34 small plants (<0.01 Mt, no closure date)

Hopewell Power Station · Southampton Power Station · Altavista Power Station · Northern Neck · Low Moor · Coit GT · Brunswick · King & Queen · Charles City · Chesapeake · Mountain View · Wicomico · Chesterfield · New Bern · Amelia · Henrico · Pine Grove · Gaston · Roanoke Rapids · Neal Shoals · Parr Hydro · Saluda · Surry · Remington Solar Facility · Coastal Virginia Offshore Wind (CVOW) · Western Branch High School · Woodland Solar Farm · Whitehouse Solar Farm · Oceana Solar · Hollyfield · Fairfield Pumped Storage · V C Summer · North Anna · Stevens Creek

Download the data
CSV files · CC BY 4.0 ⓘ
Downloads opening soon
Sources & licences