Show data table
| Projection (equity share) | Mt CO₂-e, 2026 to 2050 |
|---|---|
| Planned retirements (EIA, else GEM) | 1157 |
| Closures 5 years late | 1346 |
| No closures | 1816 |
Show data table
| Projection (operational control) | Mt CO₂-e, 2026 to 2050 |
|---|---|
| Planned retirements (EIA, else GEM) | 1196 |
| Closures 5 years late | 1404 |
| Company target (NZT) | 1058 |
| No closures | 1927 |
How others report it
Not directly comparable: different boundaries and methods. Shown for context only. Our figures use the same method for every company (EPA eGRID; 2024–25 estimated plants, sent out); company reports may add contracted generation, Scope 2 or other boundaries.
| Source | Boundary | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|
| Emissions vs Climate TRACE (Mt CO₂-e) | ||||||
| Open Assets | Scope 1, equity share, plants in both datasets | 73.2 | 73.2 | 68.1 | 69.5 | – |
| Climate TRACE (modelled) | Same plants and equity shares as ours | 71.6 | 71.7 | 67.7 | 68.4 | – |
Why Climate TRACE differs. Climate TRACE models each plant's generation from satellite and grid data and applies standard emission factors; our figures are what plants report to the regulator (EPA eGRID; 2024–25 estimated). To compare like with like, Climate TRACE plants are matched to ours and given the same equity shares, so the gap is Climate TRACE's modelling, not ownership. In our tests about half of the plant-level gap comes from generation estimates and half from emission factors (in Australia Climate TRACE's factors are too high for black coal and too low for brown coal). Company totals can look close while single plants are well off, because the errors offset.
Largest plant gaps, 2024: Lincoln Combustion Turbine: +3.3 Mt (+4633%; generation +192575%, emissions per MWh -98%); Hines Energy Complex: -2.4 Mt (-50%; generation -41%, emissions per MWh -16%); Crystal River: -1.2 Mt (-16%; generation -29%, emissions per MWh +18%).
Company target
Plants and closure dates ⓘ
Methodology →| Plant | Fuel | Mt CO₂-e | TWh | Trend | Closure | Status |
|---|---|---|---|---|---|---|
| Gibson 72% | Coal | 10.33 | 10.6 | 2030–38 | Closing | |
| 05-06 19.82 Mt · 22.4 TWh07-08 20.43 Mt · 23.3 TWh09-10 16.53 Mt · 18.9 TWh10-11 17.94 Mt · 20.2 TWh12-13 16.85 Mt · 18.6 TWh14-15 16.30 Mt · 17.7 TWh16-17 15.45 Mt · 16.7 TWh18-19 16.34 Mt · 17.6 TWh19-20 11.59 Mt · 12.2 TWh20-21 11.40 Mt · 11.8 TWh21-22 8.99 Mt · 9.2 TWh22-23 9.10 Mt · 9.2 TWh23-24 8.27 Mt · 8.0 TWh24-25 9.85 Mt · 10.0 TWh25-26 10.33 Mt · 10.6 TWh | ||||||
| Crystal River | Gas | 8.03 | 15.3 | 2034 | Closing | |
| 05-06 15.82 Mt · 22.2 TWh07-08 14.60 Mt · 22.0 TWh09-10 10.92 Mt · 16.5 TWh10-11 12.12 Mt · 12.1 TWh12-13 10.49 Mt · 10.1 TWh14-15 12.41 Mt · 11.8 TWh16-17 9.50 Mt · 8.9 TWh18-19 9.55 Mt · 9.8 TWh19-20 8.31 Mt · 15.0 TWh20-21 7.79 Mt · 14.9 TWh21-22 9.19 Mt · 16.2 TWh22-23 8.77 Mt · 15.7 TWh23-24 8.38 Mt · 16.1 TWh24-25 7.72 Mt · 15.5 TWh25-26 8.03 Mt · 15.3 TWh | ||||||
| Roxboro | Coal | 7.03 | 7.0 | 2028–33 | Closing | |
| 05-06 13.59 Mt · 14.8 TWh07-08 13.13 Mt · 15.5 TWh09-10 13.90 Mt · 15.0 TWh10-11 14.56 Mt · 16.0 TWh12-13 13.27 Mt · 14.0 TWh14-15 11.59 Mt · 12.8 TWh16-17 7.67 Mt · 8.3 TWh18-19 5.89 Mt · 5.9 TWh19-20 6.81 Mt · 6.9 TWh20-21 5.20 Mt · 5.3 TWh21-22 5.42 Mt · 5.5 TWh22-23 5.41 Mt · 5.5 TWh23-24 4.12 Mt · 4.0 TWh24-25 6.78 Mt · 6.8 TWh25-26 7.03 Mt · 7.0 TWh | ||||||
| Marshall | Coal | 5.33 | 6.9 | 2028–33 | Closing | |
| 05-06 0.00 Mt · 0.0 TWh05-06 12.15 Mt · 15.5 TWh07-08 0.00 Mt · 0.0 TWh07-08 13.24 Mt · 14.9 TWh09-10 0.00 Mt · 0.0 TWh09-10 11.62 Mt · 12.7 TWh10-11 0.00 Mt · 0.0 TWh10-11 11.53 Mt · 12.8 TWh12-13 0.00 Mt · 0.0 TWh12-13 8.99 Mt · 9.6 TWh14-15 0.00 Mt · 0.0 TWh14-15 8.67 Mt · 9.4 TWh16-17 0.00 Mt · 0.0 TWh16-17 9.00 Mt · 9.8 TWh18-19 0.00 Mt · 0.0 TWh18-19 7.96 Mt · 8.5 TWh19-20 0.00 Mt · -0.0 TWh19-20 7.39 Mt · 7.8 TWh20-21 0.00 Mt · -0.0 TWh20-21 5.58 Mt · 6.1 TWh21-22 0.00 Mt · 0.0 TWh21-22 5.73 Mt · 6.9 TWh22-23 0.00 Mt · 0.0 TWh22-23 5.27 Mt · 7.2 TWh23-24 0.00 Mt · -0.0 TWh23-24 5.15 Mt · 6.9 TWh24-25 0.00 Mt · -0.0 TWh24-25 5.67 Mt · 7.4 TWh25-26 0.00 Mt · -0.0 TWh25-26 5.33 Mt · 6.9 TWh | ||||||
| Belews Creek | Gas | 4.80 | 7.7 | 2040 | Closing | |
| 05-06 12.96 Mt · 15.3 TWh07-08 12.16 Mt · 15.0 TWh09-10 12.76 Mt · 14.7 TWh10-11 12.47 Mt · 14.7 TWh12-13 12.10 Mt · 14.0 TWh14-15 11.48 Mt · 13.4 TWh16-17 9.55 Mt · 10.7 TWh18-19 7.06 Mt · 8.0 TWh19-20 6.29 Mt · 7.1 TWh20-21 4.43 Mt · 5.3 TWh21-22 6.95 Mt · 9.0 TWh22-23 5.91 Mt · 9.2 TWh23-24 5.58 Mt · 8.5 TWh24-25 6.11 Mt · 9.6 TWh25-26 4.80 Mt · 7.7 TWh | ||||||
| Hines Energy Complex | Gas | 4.48 | 11.8 | — | No date | |
| 05-06 2.30 Mt · 6.1 TWh07-08 3.01 Mt · 7.9 TWh09-10 4.30 Mt · 11.3 TWh10-11 4.91 Mt · 12.9 TWh12-13 4.91 Mt · 13.0 TWh14-15 4.30 Mt · 11.4 TWh16-17 4.67 Mt · 12.3 TWh18-19 5.03 Mt · 13.4 TWh19-20 4.74 Mt · 11.5 TWh20-21 4.46 Mt · 11.6 TWh21-22 4.38 Mt · 11.5 TWh22-23 4.70 Mt · 12.2 TWh23-24 4.24 Mt · 11.0 TWh24-25 4.70 Mt · 12.4 TWh25-26 4.48 Mt · 11.8 TWh | ||||||
| Cliffside | Gas | 4.43 | 6.2 | 2033–40 | Closing | |
| 05-06 3.58 Mt · 3.7 TWh07-08 3.83 Mt · 4.1 TWh09-10 2.96 Mt · 3.3 TWh10-11 2.27 Mt · 2.6 TWh12-13 1.24 Mt · 1.2 TWh14-15 5.15 Mt · 6.1 TWh16-17 3.29 Mt · 3.7 TWh18-19 4.90 Mt · 5.6 TWh19-20 5.25 Mt · 6.4 TWh20-21 4.20 Mt · 5.3 TWh21-22 3.33 Mt · 4.8 TWh22-23 3.07 Mt · 5.0 TWh23-24 3.71 Mt · 5.2 TWh24-25 3.88 Mt · 4.4 TWh25-26 4.43 Mt · 6.2 TWh | ||||||
| Richmond | Gas | 4.20 | 9.9 | — | No date | |
| 05-06 1.04 Mt · 2.2 TWh07-08 1.16 Mt · 2.4 TWh09-10 1.37 Mt · 2.2 TWh10-11 2.23 Mt · 4.7 TWh12-13 3.93 Mt · 9.3 TWh14-15 3.12 Mt · 7.7 TWh16-17 4.75 Mt · 10.7 TWh18-19 5.24 Mt · 11.9 TWh19-20 3.92 Mt · 9.4 TWh20-21 3.53 Mt · 8.6 TWh21-22 3.43 Mt · 8.3 TWh22-23 4.15 Mt · 9.9 TWh23-24 3.48 Mt · 8.6 TWh24-25 3.92 Mt · 9.4 TWh25-26 4.20 Mt · 9.9 TWh | ||||||
| Cayuga 80% | Coal | 3.90 | 4.0 | 2029–30 | Closing | |
| 05-06 5.90 Mt · 6.5 TWh07-08 6.00 Mt · 7.0 TWh09-10 4.98 Mt · 5.2 TWh10-11 5.85 Mt · 6.0 TWh12-13 4.74 Mt · 4.8 TWh14-15 4.66 Mt · 4.5 TWh16-17 5.99 Mt · 6.1 TWh18-19 5.72 Mt · 6.1 TWh19-20 3.64 Mt · 3.5 TWh20-21 4.14 Mt · 4.4 TWh21-22 4.48 Mt · 4.6 TWh22-23 4.27 Mt · 4.5 TWh23-24 4.19 Mt · 4.3 TWh24-25 4.15 Mt · 4.0 TWh25-26 3.90 Mt · 4.0 TWh | ||||||
| East Bend | Coal | 2.78 | 2.6 | — | No date | |
| 05-06 3.34 Mt · 3.7 TWh07-08 3.53 Mt · 3.8 TWh09-10 4.10 Mt · 4.3 TWh10-11 4.14 Mt · 4.4 TWh12-13 3.03 Mt · 3.2 TWh14-15 3.09 Mt · 2.9 TWh16-17 3.90 Mt · 3.7 TWh18-19 2.95 Mt · 2.8 TWh19-20 3.40 Mt · 3.2 TWh20-21 2.50 Mt · 2.3 TWh21-22 2.71 Mt · 2.5 TWh22-23 3.11 Mt · 2.8 TWh23-24 2.49 Mt · 2.2 TWh24-25 2.54 Mt · 2.3 TWh25-26 2.78 Mt · 2.6 TWh | ||||||
| Edwardsport 80% | Coal | 2.41 | 3.5 | 2029 | Closing | |
| 05-06 0.40 Mt · 0.3 TWh07-08 0.33 Mt · 0.2 TWh09-10 0.07 Mt · 0.0 TWh10-11 0.17 Mt · 0.1 TWh12-13 0.13 Mt · 0.2 TWh14-15 2.23 Mt · 2.2 TWh16-17 2.59 Mt · 3.1 TWh18-19 3.10 Mt · 4.0 TWh19-20 3.28 Mt · 4.0 TWh20-21 2.72 Mt · 3.3 TWh21-22 3.24 Mt · 3.8 TWh22-23 3.17 Mt · 3.9 TWh23-24 2.72 Mt · 3.3 TWh24-25 1.91 Mt · 2.7 TWh25-26 2.41 Mt · 3.5 TWh | ||||||
| P L Bartow | Gas | 2.39 | 6.0 | 2034 | Closing | |
| 05-06 1.86 Mt · 2.0 TWh07-08 1.43 Mt · 1.5 TWh09-10 1.86 Mt · 4.1 TWh10-11 2.87 Mt · 7.0 TWh12-13 2.79 Mt · 6.9 TWh14-15 2.86 Mt · 6.8 TWh16-17 2.91 Mt · 6.6 TWh18-19 2.93 Mt · 7.1 TWh19-20 2.49 Mt · 5.8 TWh20-21 2.77 Mt · 6.8 TWh21-22 2.14 Mt · 5.3 TWh22-23 2.69 Mt · 6.6 TWh23-24 2.68 Mt · 6.6 TWh24-25 2.50 Mt · 6.3 TWh25-26 2.39 Mt · 6.0 TWh | ||||||
| W S Lee | Gas | 2.35 | 6.0 | — | No date | |
| 05-06 1.46 Mt · 1.4 TWh07-08 1.51 Mt · 1.5 TWh09-10 0.43 Mt · 0.4 TWh10-11 1.08 Mt · 1.1 TWh12-13 0.18 Mt · 0.2 TWh14-15 0.34 Mt · 0.3 TWh16-17 0.18 Mt · 0.3 TWh18-19 1.40 Mt · 3.7 TWh19-20 2.03 Mt · 5.3 TWh20-21 2.33 Mt · 6.0 TWh21-22 2.27 Mt · 5.9 TWh22-23 1.84 Mt · 4.7 TWh23-24 2.34 Mt · 6.0 TWh24-25 2.21 Mt · 5.6 TWh25-26 2.35 Mt · 6.0 TWh | ||||||
| Lee Combined Cycle Plant | Gas | 2.20 | 5.7 | — | No date | |
| 12-13 0.00 Mt · 0.0 TWh24-25 2.50 Mt · 6.5 TWh25-26 2.20 Mt · 5.7 TWh | ||||||
| Asheville | Gas | 1.58 | 3.7 | — | No date | |
| 05-06 2.39 Mt · 2.5 TWh07-08 2.35 Mt · 2.5 TWh09-10 2.14 Mt · 2.2 TWh10-11 2.40 Mt · 2.5 TWh12-13 1.96 Mt · 2.0 TWh14-15 1.60 Mt · 1.6 TWh16-17 1.48 Mt · 1.5 TWh18-19 1.64 Mt · 1.7 TWh19-20 1.40 Mt · 1.3 TWh20-21 1.20 Mt · 3.2 TWh21-22 1.45 Mt · 3.8 TWh22-23 1.59 Mt · 4.0 TWh23-24 1.45 Mt · 3.9 TWh24-25 1.47 Mt · 3.8 TWh25-26 1.58 Mt · 3.7 TWh | ||||||
| Mayo | Coal | 1.54 | 1.3 | 2031 | Closing | |
| 05-06 4.79 Mt · 5.0 TWh07-08 4.09 Mt · 4.7 TWh09-10 3.92 Mt · 4.1 TWh10-11 4.77 Mt · 4.9 TWh12-13 3.48 Mt · 3.5 TWh14-15 2.66 Mt · 2.6 TWh16-17 2.14 Mt · 2.0 TWh18-19 1.74 Mt · 1.5 TWh19-20 1.77 Mt · 1.5 TWh20-21 0.81 Mt · 0.6 TWh21-22 1.55 Mt · 1.3 TWh22-23 1.38 Mt · 1.1 TWh23-24 1.37 Mt · 1.2 TWh24-25 1.06 Mt · 0.9 TWh25-26 1.54 Mt · 1.3 TWh | ||||||
| Buck | Gas | 1.53 | 4.0 | — | No date | |
| 05-06 1.61 Mt · 1.6 TWh07-08 1.65 Mt · 1.7 TWh09-10 0.40 Mt · 0.4 TWh10-11 1.09 Mt · 1.1 TWh12-13 1.80 Mt · 4.4 TWh14-15 1.42 Mt · 3.7 TWh16-17 1.86 Mt · 5.0 TWh18-19 1.95 Mt · 5.2 TWh19-20 1.66 Mt · 4.4 TWh20-21 1.46 Mt · 3.9 TWh21-22 1.70 Mt · 4.5 TWh22-23 1.85 Mt · 4.9 TWh23-24 1.46 Mt · 3.8 TWh24-25 1.64 Mt · 4.2 TWh25-26 1.53 Mt · 4.0 TWh | ||||||
| Dan River | Gas | 1.52 | 3.9 | — | No date | |
| 05-06 0.75 Mt · 0.6 TWh07-08 1.13 Mt · 1.1 TWh09-10 0.19 Mt · 0.2 TWh10-11 0.64 Mt · 0.6 TWh12-13 0.04 Mt · 0.1 TWh14-15 1.47 Mt · 3.8 TWh16-17 1.84 Mt · 4.8 TWh18-19 1.92 Mt · 5.0 TWh19-20 1.70 Mt · 4.4 TWh20-21 1.73 Mt · 4.5 TWh21-22 1.61 Mt · 4.2 TWh22-23 1.59 Mt · 4.1 TWh23-24 1.46 Mt · 3.7 TWh24-25 1.79 Mt · 4.6 TWh25-26 1.52 Mt · 3.9 TWh | ||||||
| Osprey Energy Center | Gas | 1.40 | 3.7 | — | No date | |
| 05-06 0.73 Mt · 1.7 TWh07-08 0.91 Mt · 2.2 TWh09-10 0.98 Mt · 2.5 TWh10-11 0.87 Mt · 2.2 TWh12-13 1.25 Mt · 3.1 TWh14-15 0.57 Mt · 1.4 TWh16-17 1.16 Mt · 3.0 TWh18-19 0.78 Mt · 2.0 TWh19-20 0.87 Mt · 2.2 TWh20-21 0.93 Mt · 2.4 TWh21-22 0.94 Mt · 2.4 TWh22-23 0.74 Mt · 1.9 TWh23-24 0.85 Mt · 2.1 TWh24-25 1.20 Mt · 3.1 TWh25-26 1.40 Mt · 3.7 TWh | ||||||
| L V Sutton Combined Cycle | Not stated | 1.37 | 3.5 | — | No date | |
| 24-25 1.51 Mt · 4.0 TWh25-26 1.37 Mt · 3.5 TWh | ||||||
| Anclote | Gas | 1.27 | 2.0 | — | No date | |
| 05-06 3.92 Mt · 4.3 TWh07-08 2.81 Mt · 3.3 TWh09-10 1.38 Mt · 1.6 TWh10-11 1.48 Mt · 1.9 TWh12-13 1.14 Mt · 1.7 TWh14-15 1.44 Mt · 2.4 TWh16-17 1.99 Mt · 3.5 TWh18-19 1.57 Mt · 2.7 TWh19-20 1.36 Mt · 2.3 TWh20-21 1.39 Mt · 2.2 TWh21-22 1.26 Mt · 2.1 TWh22-23 1.36 Mt · 2.2 TWh23-24 1.15 Mt · 1.7 TWh24-25 1.02 Mt · 1.6 TWh25-26 1.27 Mt · 2.0 TWh | ||||||
| Rockingham County CT Station | Gas | 1.05 | 1.8 | — | No date | |
| 05-06 0.04 Mt · 0.1 TWh07-08 0.19 Mt · 0.3 TWh09-10 0.07 Mt · 0.1 TWh10-11 0.25 Mt · 0.4 TWh12-13 0.41 Mt · 0.7 TWh14-15 0.15 Mt · 0.2 TWh16-17 0.73 Mt · 1.3 TWh18-19 1.34 Mt · 2.3 TWh19-20 0.54 Mt · 1.0 TWh20-21 0.37 Mt · 0.7 TWh21-22 0.41 Mt · 0.7 TWh22-23 0.83 Mt · 1.4 TWh23-24 0.46 Mt · 0.8 TWh24-25 0.82 Mt · 1.4 TWh25-26 1.05 Mt · 1.8 TWh | ||||||
| Noblesville 80% | Gas | 0.68 | 1.7 | — | No date | |
| 05-06 0.21 Mt · 0.5 TWh07-08 0.18 Mt · 0.4 TWh09-10 0.06 Mt · 0.1 TWh10-11 0.10 Mt · 0.2 TWh12-13 0.35 Mt · 0.8 TWh14-15 0.14 Mt · 0.3 TWh16-17 0.44 Mt · 1.1 TWh18-19 0.60 Mt · 1.5 TWh19-20 0.58 Mt · 1.4 TWh20-21 0.68 Mt · 1.7 TWh21-22 0.52 Mt · 1.3 TWh22-23 0.62 Mt · 1.6 TWh23-24 0.51 Mt · 1.3 TWh24-25 0.72 Mt · 1.8 TWh25-26 0.68 Mt · 1.7 TWh | ||||||
| Lincoln | Oil | 0.50 | 1.0 | — | No date | |
| 05-06 0.03 Mt · 0.0 TWh07-08 0.12 Mt · 0.2 TWh09-10 0.01 Mt · 0.0 TWh10-11 0.06 Mt · 0.1 TWh12-13 0.02 Mt · 0.0 TWh14-15 0.06 Mt · 0.1 TWh16-17 0.04 Mt · 0.0 TWh18-19 0.07 Mt · 0.1 TWh19-20 0.02 Mt · 0.0 TWh20-21 0.03 Mt · 0.0 TWh21-22 0.22 Mt · 0.0 TWh22-23 0.12 Mt · 0.0 TWh23-24 0.02 Mt · 0.0 TWh24-25 0.07 Mt · 0.0 TWh25-26 0.50 Mt · 1.0 TWh | ||||||
| Madison 80% | Gas | 0.48 | 0.7 | — | No date | |
| 05-06 0.30 Mt · 0.4 TWh07-08 0.14 Mt · 0.2 TWh09-10 0.07 Mt · 0.1 TWh10-11 0.11 Mt · 0.1 TWh12-13 0.13 Mt · 0.2 TWh14-15 0.10 Mt · 0.1 TWh16-17 0.33 Mt · 0.4 TWh18-19 0.38 Mt · 0.5 TWh19-20 0.24 Mt · 0.3 TWh20-21 0.22 Mt · 0.3 TWh21-22 0.37 Mt · 0.5 TWh22-23 0.45 Mt · 0.6 TWh23-24 0.63 Mt · 0.9 TWh24-25 0.73 Mt · 1.0 TWh25-26 0.48 Mt · 0.7 TWh | ||||||
| Wayne County | Gas | 0.38 | 0.6 | — | No date | |
| 05-06 0.10 Mt · 0.1 TWh07-08 0.14 Mt · 0.2 TWh09-10 0.25 Mt · 0.4 TWh10-11 0.23 Mt · 0.4 TWh12-13 0.48 Mt · 0.8 TWh14-15 0.05 Mt · 0.1 TWh16-17 0.32 Mt · 0.6 TWh18-19 0.28 Mt · 0.5 TWh24-25 0.04 Mt · 0.1 TWh25-26 0.38 Mt · 0.6 TWh | ||||||
| Woodsdale | Gas | 0.35 | 0.3 | — | No date | |
| 05-06 0.05 Mt · 0.0 TWh07-08 0.10 Mt · 0.1 TWh09-10 0.07 Mt · 0.0 TWh10-11 0.09 Mt · 0.0 TWh12-13 0.02 Mt · 0.0 TWh14-15 0.02 Mt · 0.0 TWh16-17 0.04 Mt · 0.0 TWh18-19 0.10 Mt · 0.1 TWh19-20 0.11 Mt · 0.1 TWh20-21 0.05 Mt · 0.1 TWh21-22 0.06 Mt · 0.1 TWh22-23 0.11 Mt · 0.1 TWh23-24 0.18 Mt · 0.2 TWh24-25 0.32 Mt · 0.4 TWh25-26 0.35 Mt · 0.3 TWh | ||||||
| Tiger Bay | Gas | 0.30 | 0.8 | — | No date | |
| 05-06 0.37 Mt · 0.9 TWh07-08 0.35 Mt · 0.9 TWh09-10 0.42 Mt · 1.1 TWh10-11 0.36 Mt · 1.0 TWh12-13 0.50 Mt · 1.3 TWh14-15 0.43 Mt · 1.1 TWh16-17 0.40 Mt · 1.0 TWh18-19 0.46 Mt · 1.2 TWh19-20 0.29 Mt · 0.7 TWh20-21 0.31 Mt · 0.8 TWh21-22 0.46 Mt · 1.2 TWh22-23 0.49 Mt · 1.3 TWh23-24 0.44 Mt · 1.1 TWh24-25 0.40 Mt · 1.0 TWh25-26 0.30 Mt · 0.8 TWh | ||||||
| Vermillion Energy Facility 50% | Gas | 0.30 | 0.4 | — | No date | |
| 05-06 0.07 Mt · 0.1 TWh07-08 0.09 Mt · 0.1 TWh09-10 0.03 Mt · 0.0 TWh10-11 0.06 Mt · 0.1 TWh12-13 0.07 Mt · 0.1 TWh14-15 0.02 Mt · 0.0 TWh16-17 0.10 Mt · 0.1 TWh18-19 0.17 Mt · 0.2 TWh19-20 0.07 Mt · 0.1 TWh20-21 0.12 Mt · 0.2 TWh21-22 0.18 Mt · 0.3 TWh22-23 0.33 Mt · 0.5 TWh23-24 0.40 Mt · 0.6 TWh24-25 0.51 Mt · 0.7 TWh25-26 0.30 Mt · 0.4 TWh | ||||||
| University of Florida | Gas | 0.18 | 0.4 | — | No date | |
| 05-06 0.17 Mt · 0.4 TWh07-08 0.16 Mt · 0.4 TWh09-10 0.14 Mt · 0.3 TWh10-11 0.15 Mt · 0.3 TWh12-13 0.16 Mt · 0.4 TWh14-15 0.20 Mt · 0.4 TWh16-17 0.18 Mt · 0.4 TWh18-19 0.15 Mt · 0.3 TWh19-20 0.15 Mt · 0.3 TWh20-21 0.15 Mt · 0.3 TWh21-22 0.16 Mt · 0.4 TWh22-23 0.17 Mt · 0.4 TWh23-24 0.17 Mt · 0.4 TWh24-25 0.18 Mt · 0.4 TWh25-26 0.18 Mt · 0.4 TWh | ||||||
| Henry County 80% | Gas | 0.16 | 0.3 | — | No date | |
| 05-06 0.06 Mt · 0.1 TWh07-08 0.05 Mt · 0.1 TWh09-10 0.02 Mt · 0.0 TWh10-11 0.03 Mt · 0.0 TWh12-13 0.05 Mt · 0.1 TWh14-15 0.03 Mt · 0.0 TWh16-17 0.09 Mt · 0.1 TWh18-19 0.17 Mt · 0.3 TWh19-20 0.14 Mt · 0.2 TWh20-21 0.16 Mt · 0.3 TWh21-22 0.10 Mt · 0.2 TWh22-23 0.11 Mt · 0.2 TWh23-24 0.14 Mt · 0.2 TWh24-25 0.20 Mt · 0.3 TWh25-26 0.16 Mt · 0.3 TWh | ||||||
| Intercession City 96% | Gas | 0.15 | 0.2 | 2034 | Closing | |
| 05-06 0.57 Mt · 0.8 TWh07-08 0.54 Mt · 0.8 TWh09-10 0.52 Mt · 0.7 TWh10-11 0.58 Mt · 0.8 TWh12-13 0.22 Mt · 0.3 TWh14-15 0.19 Mt · 0.3 TWh16-17 0.28 Mt · 0.4 TWh18-19 0.39 Mt · 0.5 TWh19-20 0.26 Mt · 0.4 TWh20-21 0.23 Mt · 0.3 TWh21-22 0.27 Mt · 0.4 TWh22-23 0.29 Mt · 0.4 TWh23-24 0.20 Mt · 0.3 TWh24-25 0.26 Mt · 0.3 TWh25-26 0.15 Mt · 0.2 TWh | ||||||
| Wheatland Generating Facility 80% | Gas | 0.12 | 0.2 | — | No date | |
| 05-06 0.01 Mt · 0.0 TWh07-08 0.02 Mt · 0.0 TWh09-10 0.01 Mt · 0.0 TWh10-11 0.04 Mt · 0.1 TWh12-13 0.07 Mt · 0.1 TWh14-15 0.03 Mt · 0.0 TWh16-17 0.08 Mt · 0.1 TWh18-19 0.15 Mt · 0.2 TWh19-20 0.09 Mt · 0.1 TWh20-21 0.11 Mt · 0.1 TWh21-22 0.13 Mt · 0.2 TWh22-23 0.04 Mt · 0.1 TWh23-24 0.06 Mt · 0.1 TWh24-25 0.10 Mt · 0.1 TWh25-26 0.12 Mt · 0.2 TWh | ||||||
| Mill Creek | Gas | 0.08 | 0.1 | — | No date | |
| 05-06 0.04 Mt · 0.1 TWh07-08 0.13 Mt · 0.2 TWh09-10 0.00 Mt · 0.0 TWh10-11 0.06 Mt · 0.1 TWh12-13 0.08 Mt · 0.1 TWh14-15 0.02 Mt · 0.0 TWh16-17 0.07 Mt · 0.1 TWh18-19 0.14 Mt · 0.2 TWh19-20 0.05 Mt · 0.1 TWh20-21 0.05 Mt · 0.1 TWh21-22 0.05 Mt · 0.1 TWh22-23 0.09 Mt · 0.1 TWh23-24 0.03 Mt · 0.0 TWh24-25 0.02 Mt · 0.0 TWh25-26 0.08 Mt · 0.1 TWh | ||||||
| DeBary | Gas | 0.07 | 0.1 | 2034 | Closing | |
| 05-06 0.26 Mt · 0.4 TWh07-08 0.11 Mt · 0.1 TWh09-10 0.13 Mt · 0.2 TWh10-11 0.23 Mt · 0.3 TWh12-13 0.04 Mt · 0.1 TWh14-15 0.06 Mt · 0.1 TWh16-17 0.13 Mt · 0.2 TWh18-19 0.02 Mt · 0.0 TWh19-20 0.10 Mt · 0.1 TWh20-21 0.10 Mt · 0.1 TWh21-22 0.12 Mt · 0.2 TWh22-23 0.09 Mt · 0.1 TWh23-24 0.08 Mt · 0.1 TWh24-25 0.04 Mt · 0.1 TWh25-26 0.07 Mt · 0.1 TWh | ||||||
| Purdue CHP | Gas | 0.07 | 0.1 | — | No date | |
| 22-23 0.06 Mt · 0.1 TWh23-24 0.07 Mt · 0.1 TWh24-25 0.08 Mt · 0.1 TWh25-26 0.07 Mt · 0.1 TWh | ||||||
| Duke Energy CHP at Clemson University | Gas | 0.07 | 0.1 | — | No date | |
| 19-20 0.00 Mt · 0.0 TWh20-21 0.00 Mt · 0.0 TWh21-22 0.01 Mt · 0.0 TWh22-23 0.06 Mt · 0.1 TWh23-24 0.07 Mt · 0.1 TWh24-25 0.06 Mt · 0.1 TWh25-26 0.07 Mt · 0.1 TWh | ||||||
| Darlington County | Gas | 0.04 | 0.1 | — | No date | |
| 05-06 0.05 Mt · 0.1 TWh07-08 0.08 Mt · 0.1 TWh09-10 0.06 Mt · 0.1 TWh10-11 0.12 Mt · 0.1 TWh12-13 0.08 Mt · 0.1 TWh14-15 0.11 Mt · 0.1 TWh16-17 0.09 Mt · 0.1 TWh18-19 0.19 Mt · 0.2 TWh19-20 0.02 Mt · 0.0 TWh20-21 0.00 Mt · 0.0 TWh21-22 0.00 Mt · 0.0 TWh22-23 0.06 Mt · 0.1 TWh23-24 0.02 Mt · 0.0 TWh24-25 0.01 Mt · 0.0 TWh25-26 0.04 Mt · 0.1 TWh | ||||||
| Suwannee River | Gas | 0.04 | 0.1 | — | No date | |
| 05-06 0.48 Mt · 0.5 TWh07-08 0.33 Mt · 0.4 TWh09-10 0.21 Mt · 0.3 TWh10-11 0.35 Mt · 0.5 TWh12-13 0.37 Mt · 0.5 TWh14-15 0.37 Mt · 0.5 TWh16-17 0.36 Mt · 0.5 TWh18-19 0.04 Mt · 0.0 TWh19-20 0.05 Mt · 0.1 TWh20-21 0.05 Mt · 0.1 TWh21-22 0.05 Mt · 0.1 TWh22-23 0.07 Mt · 0.1 TWh23-24 0.00 Mt · 0.0 TWh24-25 0.00 Mt · 0.1 TWh25-26 0.04 Mt · 0.1 TWh | ||||||
| Bayboro | Oil | 0.00 | 0.0 | 2026 | Closing | |
| 05-06 0.06 Mt · 0.1 TWh07-08 0.05 Mt · 0.1 TWh09-10 0.05 Mt · 0.0 TWh10-11 0.01 Mt · 0.0 TWh12-13 0.00 Mt · 0.0 TWh14-15 0.01 Mt · 0.0 TWh16-17 0.00 Mt · 0.0 TWh18-19 0.01 Mt · 0.0 TWh19-20 0.00 Mt · 0.0 TWh20-21 0.00 Mt · 0.0 TWh21-22 0.00 Mt · 0.0 TWh22-23 0.00 Mt · 0.0 TWh23-24 0.00 Mt · 0.0 TWh24-25 0.00 Mt · 0.0 TWh25-26 0.00 Mt · 0.0 TWh | ||||||
| No longer reporting under this company | ||||||
| G G Allen | Coal | 0.25 | 0.2 | 24 | Retired / sold | |
| 05-06 5.67 Mt · 6.4 TWh07-08 6.33 Mt · 6.9 TWh09-10 3.61 Mt · 3.7 TWh10-11 5.07 Mt · 5.5 TWh12-13 1.89 Mt · 1.9 TWh14-15 2.31 Mt · 2.4 TWh16-17 1.50 Mt · 1.4 TWh18-19 0.87 Mt · 0.8 TWh19-20 0.97 Mt · 0.9 TWh20-21 0.54 Mt · 0.5 TWh21-22 0.20 Mt · 0.2 TWh22-23 0.30 Mt · 0.2 TWh23-24 0.14 Mt · 0.1 TWh24-25 0.25 Mt · 0.2 TWh | ||||||
| H F Lee Steam Electric Plant | Gas | 2.52 | 6.5 | 23 | Retired / sold | |
| 05-06 2.26 Mt · 2.0 TWh07-08 2.28 Mt · 2.3 TWh09-10 2.00 Mt · 2.3 TWh10-11 2.45 Mt · 2.7 TWh12-13 1.28 Mt · 0.8 TWh14-15 2.37 Mt · 4.6 TWh16-17 2.80 Mt · 6.4 TWh18-19 3.04 Mt · 7.2 TWh19-20 2.64 Mt · 6.8 TWh20-21 2.30 Mt · 5.8 TWh21-22 2.26 Mt · 5.8 TWh22-23 2.73 Mt · 6.6 TWh23-24 2.52 Mt · 6.5 TWh | ||||||
| L V Sutton | Gas | 1.49 | 3.9 | 23 | Retired / sold | |
| 05-06 3.21 Mt · 3.1 TWh07-08 2.98 Mt · 3.0 TWh09-10 2.27 Mt · 2.4 TWh10-11 2.51 Mt · 2.6 TWh12-13 1.39 Mt · 1.3 TWh14-15 1.54 Mt · 3.1 TWh16-17 1.79 Mt · 4.7 TWh18-19 1.48 Mt · 3.6 TWh19-20 1.79 Mt · 4.6 TWh20-21 1.57 Mt · 4.1 TWh21-22 1.60 Mt · 4.2 TWh22-23 1.50 Mt · 3.9 TWh23-24 1.49 Mt · 3.9 TWh | ||||||
| R Gallagher 80% | Coal | 0.03 | 0.0 | 21 | Retired / sold | |
| 05-06 2.85 Mt · 2.9 TWh07-08 2.90 Mt · 3.1 TWh09-10 1.64 Mt · 1.8 TWh10-11 2.08 Mt · 2.3 TWh12-13 0.27 Mt · 0.2 TWh14-15 0.87 Mt · 0.9 TWh16-17 0.36 Mt · 0.3 TWh18-19 0.29 Mt · 0.3 TWh19-20 0.05 Mt · 0.0 TWh20-21 0.06 Mt · 0.0 TWh21-22 0.03 Mt · 0.0 TWh | ||||||
| Higgins | Gas | 0.01 | 0.0 | 19 | Retired / sold | |
| 05-06 0.05 Mt · 0.1 TWh07-08 0.04 Mt · 0.0 TWh09-10 0.03 Mt · 0.0 TWh10-11 0.02 Mt · 0.0 TWh12-13 0.00 Mt · 0.0 TWh14-15 0.01 Mt · 0.0 TWh16-17 0.02 Mt · 0.0 TWh18-19 0.02 Mt · 0.0 TWh19-20 0.01 Mt · 0.0 TWh20-21 0.00 Mt · 0.0 TWh | ||||||
| Wabash River 0% | Not stated | 0.42 | 0.5 | 16 | Retired / sold | |
| 05-06 4.91 Mt · 4.7 TWh07-08 5.21 Mt · 4.3 TWh09-10 4.12 Mt · 3.4 TWh10-11 3.87 Mt · 2.9 TWh12-13 2.39 Mt · 2.6 TWh14-15 2.83 Mt · 2.8 TWh16-17 0.42 Mt · 0.5 TWh18-19 0.00 Mt · 0.0 TWh19-20 0.00 Mt · 0.0 TWh20-21 0.00 Mt · 0.0 TWh | ||||||
| Walter C Beckjord 76% | Other | 1.90 | 1.5 | 14 | Retired / sold | |
| 05-06 6.15 Mt · 6.5 TWh07-08 6.05 Mt · 6.1 TWh09-10 4.96 Mt · 5.1 TWh10-11 3.91 Mt · 3.8 TWh12-13 3.19 Mt · 3.2 TWh14-15 1.90 Mt · 1.5 TWh16-17 0.00 Mt · -0.1 TWh18-19 0.00 Mt · -0.0 TWh19-20 0.00 Mt · -0.0 TWh20-21 0.00 Mt · -0.0 TWh21-22 0.00 Mt · -0.0 TWh22-23 0.00 Mt · -0.0 TWh23-24 0.00 Mt · -0.0 TWh24-25 0.00 Mt · -0.0 TWh25-26 0.00 Mt · -0.0 TWh | ||||||
| Cape Fear | Not stated | 0.43 | 0.5 | 12 | Retired / sold | |
| 05-06 1.79 Mt · 1.9 TWh07-08 1.81 Mt · 2.1 TWh09-10 1.55 Mt · 1.7 TWh10-11 1.76 Mt · 2.0 TWh12-13 0.43 Mt · 0.5 TWh14-15 0.00 Mt · 0.0 TWh16-17 0.00 Mt · 0.0 TWh18-19 0.00 Mt · 0.0 TWh19-20 0.00 Mt · 0.0 TWh20-21 0.00 Mt · 0.0 TWh | ||||||
| Riverbend | Not stated | 0.18 | 0.2 | 12 | Retired / sold | |
| 05-06 1.82 Mt · 1.8 TWh07-08 2.18 Mt · 2.2 TWh09-10 0.50 Mt · 0.5 TWh10-11 1.26 Mt · 1.3 TWh12-13 0.18 Mt · 0.2 TWh14-15 0.00 Mt · 0.0 TWh16-17 0.00 Mt · 0.0 TWh18-19 0.00 Mt · 0.0 TWh19-20 0.00 Mt · 0.0 TWh20-21 0.00 Mt · 0.0 TWh | ||||||
+ 77 small plants (<0.01 Mt, no closure date)
W H Weatherspoon · Blewett · Markland · Tillery · Walters · Bridgewater · Cowans Ford · Lookout Shoals · Mountain Island · Oxford · Rhodhiss · Cedar Cliff · Nantahala · Tennessee Creek · Thorpe · Tuckasegee · H B Robinson · Cedar Creek · Dearborn · Fishing Creek · Oconee · Wateree · Wylie · 99 Islands · DE Solar 1725 Drywall Dr · Warsaw Farm · DD Fayetteville Solar NC LLC · Elm City Solar Facility · Mocksville Solar · Osceola Solar Facility · Camp Lejeune Solar · Perry Solar Facility · Brunswick · Harris · Catawba · McGuire · Monroe Solar Facility · Crane Solar Facility · Suwannee Solar Facility · Crittenden Solar Facility · Walton 1 Solar Facility · Walton 2 Solar Facility · Hamilton Solar Power Plant · Columbia Solar Power Plant · Woodleaf Solar Facility · Lake Placid Solar Power Plant · Debary Solar Power Plant · Trenton Solar Power Plant · Maiden Creek Solar Power Plant · Gaston Solar Power Plant · Tippecanoe Solar Power Plant · Camp Atterbury Microgrid Hybrid · Santa Fe Solar Power Plant · Twin Rivers Solar Power Plant · Duette Solar Power Plant · Charlie Creek Solar Power Plant · Bay Trail Solar Power Plant · Sandy Creek Solar Power Plant · Queens Creek · Fort Green Solar Power Plant · Hot Springs Energy Storage & Microgrid · John Hopkins Middle School Microgrid · Woodfin Solar · Aero Solar Facility · Keowee · Hildreth Solar Power Plant · Bay Ranch Solar Power Plant · High Springs Solar Power Plant · Hardeetown Solar Power Plant · Mule Creek Renewable Energy Center · Winquepin Renewable Energy Center · Falmouth Renewable Energy Center · County Line Renewable Energy Center · Sundance Renewable Energy Center · Red Bud Solar Plant · Rattler Solar Plant · Half Moon Solar Plant
Please cite: Open Assets (University of Oxford & The University of Queensland). Power plant emissions and closures, version 2026-10. https://open-assets.ai/power/
- README.md citation, licences, sources, column notes
- power_company_series.csv CC BY 4.0 ⓘ
- power_plants.csv CC BY 4.0 ⓘ
- power_plant_annual.csv CC BY 4.0 ⓘ
- power_company_series_us.csv CC BY 4.0 ⓘ
- power_plants_us.csv CC BY 4.0 ⓘ
- power_plant_annual_us.csv CC BY 4.0 ⓘ
- power_company_series_eu.csv CC BY 4.0 ⓘ
- power_plants_eu.csv CC BY 4.0 ⓘ
- power_closure_events.csv CC BY 4.0 ⓘ
- power_aggregate.csv CC BY 4.0 ⓘ
Sources & licences
- US Environmental Protection Agency, Emissions & Generation Resource Integrated Database (eGRID) (eGRID2018 to eGRID2023 (rev2)). US plant emissions (CO₂-e) and net generation, 2018-2023. US government work, public domain
- US Energy Information Administration, Power Plant Operations Report (EIA-923) (2023, 2024 and 2025 final data). US plant generation and fuel use for 2024-2025 (eGRID not yet published), with EPA default emission factors (40 CFR 98). US government work, public domain
- US Environmental Protection Agency, Clean Air Markets Program Data (CAMPD) (Annual facility emissions, 2023-2025 (downloaded October 2026)). Measured CO₂ of large US fossil plants for 2024-2025, as eGRID uses it. US government work, public domain
- US Energy Information Administration, Preliminary Monthly Electric Generator Inventory (EIA-860M) (August 2026). US generators: operator, capacity, planned retirement month and year. US government work, public domain
- Global Energy Monitor, Global Coal Plant Tracker; Global Oil and Gas Plant Tracker (July 2026 (coal), August 2026 (oil and gas)). Plant owners and equity shares (equity-share basis). CC BY 4.0
- Climate TRACE, Electricity generation emissions sources (v5.2.0). Comparison only ("How others report it"): modelled plant emissions and generation. CC BY 4.0
- Open Assets data: CC BY 4.0. Company targets (Net Zero Tracker, CC BY-NC 4.0) and TPI data are shown on the site for comparison but are not part of the downloadable data. Cite as: Open Assets (University of Oxford & The University of Queensland). Power plant emissions and closures, version 2026-10. https://open-assets.ai/power/