7.3 Mt
Scope 1 emissions, 2025 ⓘ
—
t CO₂-e/MWh sent out, 2025 ⓘ
6.5 Mt
Scope 1 emissions, 2025 ⓘ
—
t CO₂-e/MWh sent out, 2025 ⓘ
18
Plants reporting in 2025
74%
covered by planned retirement dates
Basis:
Show data table
| Projection (equity share) | Mt CO₂-e, 2026 to 2050 |
|---|---|
| Planned retirements (GEM) | 120 |
| Closures 5 years late | 140 |
| No closures | 183 |
Show data table
| Projection (operational control) | Mt CO₂-e, 2026 to 2050 |
|---|---|
| Planned retirements (GEM) | 103 |
| Closures 5 years late | 122 |
| No closures | 166 |
Company target
Targets for European companies are not added yet (Oxford Net Zero Tracker; next step).
Plants and closure dates ⓘ
Methodology →Fossil plants closing
2 plants · 4.9 Mt
Fossil, no closure date
4 plants · 0.5 Mt
Renewables with end-of-life date
0 plants
| Plant | Fuel | Mt CO₂-e | TWh | Trend | Closure | Status |
|---|---|---|---|---|---|---|
| Siekierki power station | Coal | 2.78 | — | 2035 | Closing ⓘ | |
| 13-14 3.29 Mt · — TWh14-15 3.16 Mt · — TWh15-16 2.84 Mt · — TWh16-17 2.97 Mt · — TWh17-18 3.05 Mt · — TWh18-19 3.13 Mt · — TWh19-20 2.96 Mt · — TWh20-21 2.73 Mt · — TWh21-22 3.10 Mt · — TWh22-23 2.94 Mt · — TWh23-24 2.95 Mt · — TWh24-25 2.83 Mt · — TWh25-26 2.78 Mt · — TWh | ||||||
| Zeran power station | Coal | 2.07 | — | 2035 | Closing ⓘ | |
| 13-14 2.49 Mt · — TWh14-15 2.27 Mt · — TWh15-16 2.32 Mt · — TWh16-17 2.30 Mt · — TWh17-18 2.34 Mt · — TWh18-19 2.22 Mt · — TWh19-20 2.17 Mt · — TWh20-21 2.10 Mt · — TWh21-22 2.09 Mt · — TWh22-23 1.84 Mt · — TWh23-24 1.90 Mt · — TWh24-25 1.97 Mt · — TWh25-26 2.07 Mt · — TWh | ||||||
| Blok gazowo-parowy CCGT | Not stated (no GEM link) | 0.66 | — | — | No date ⓘ | |
| 16-17 0.00 Mt · — TWh17-18 0.56 Mt · — TWh18-19 0.75 Mt · — TWh19-20 0.92 Mt · — TWh20-21 1.05 Mt · — TWh21-22 1.02 Mt · — TWh22-23 0.65 Mt · — TWh23-24 0.91 Mt · — TWh24-25 0.87 Mt · — TWh25-26 0.66 Mt · — TWh | ||||||
| Zofiowka Mine power station | Coal | 0.28 | — | — | No date ⓘ | |
| 13-14 0.38 Mt · — TWh14-15 0.31 Mt · — TWh15-16 0.02 Mt · — TWh16-17 0.26 Mt · — TWh17-18 0.24 Mt · — TWh18-19 0.22 Mt · — TWh19-20 0.48 Mt · — TWh20-21 0.43 Mt · — TWh21-22 0.49 Mt · — TWh22-23 0.47 Mt · — TWh23-24 0.30 Mt · — TWh24-25 0.26 Mt · — TWh25-26 0.28 Mt · — TWh | ||||||
| Włocławek power station | Gas & liquid fuels | 0.11 | — | — | No date ⓘ | |
| 13-14 0.12 Mt · — TWh13-14 0.20 Mt · — TWh14-15 0.11 Mt · — TWh14-15 0.18 Mt · — TWh15-16 0.11 Mt · — TWh15-16 0.18 Mt · — TWh16-17 0.12 Mt · — TWh16-17 0.14 Mt · — TWh17-18 0.13 Mt · — TWh17-18 0.11 Mt · — TWh18-19 0.12 Mt · — TWh18-19 0.10 Mt · — TWh19-20 0.11 Mt · — TWh19-20 0.09 Mt · — TWh20-21 0.12 Mt · — TWh20-21 0.07 Mt · — TWh21-22 0.12 Mt · — TWh21-22 0.07 Mt · — TWh22-23 0.11 Mt · — TWh22-23 0.08 Mt · — TWh23-24 0.11 Mt · — TWh23-24 0.07 Mt · — TWh24-25 0.11 Mt · — TWh24-25 0.08 Mt · — TWh25-26 0.11 Mt · — TWh25-26 0.09 Mt · — TWh | ||||||
| ELEKTROCIEPŁOWNIA PRUSZKÓW | Not stated (no GEM link) | 0.11 | — | — | No date ⓘ | |
| 13-14 0.14 Mt · — TWh14-15 0.13 Mt · — TWh15-16 0.12 Mt · — TWh16-17 0.13 Mt · — TWh17-18 0.13 Mt · — TWh18-19 0.13 Mt · — TWh19-20 0.12 Mt · — TWh20-21 0.11 Mt · — TWh21-22 0.13 Mt · — TWh22-23 0.11 Mt · — TWh23-24 0.11 Mt · — TWh24-25 0.10 Mt · — TWh25-26 0.11 Mt · — TWh | ||||||
| CIEPŁOWNIA KAWĘCZYN | Not stated (no GEM link) | 0.10 | — | — | No date ⓘ | |
| 13-14 0.11 Mt · — TWh14-15 0.08 Mt · — TWh15-16 0.12 Mt · — TWh16-17 0.07 Mt · — TWh17-18 0.10 Mt · — TWh18-19 0.09 Mt · — TWh19-20 0.08 Mt · — TWh20-21 0.10 Mt · — TWh21-22 0.20 Mt · — TWh22-23 0.11 Mt · — TWh23-24 0.07 Mt · — TWh24-25 0.08 Mt · — TWh25-26 0.10 Mt · — TWh | ||||||
| Włocławek power station | Gas & liquid fuels | 0.09 | — | — | No date ⓘ | |
| 13-14 0.12 Mt · — TWh13-14 0.20 Mt · — TWh14-15 0.11 Mt · — TWh14-15 0.18 Mt · — TWh15-16 0.11 Mt · — TWh15-16 0.18 Mt · — TWh16-17 0.12 Mt · — TWh16-17 0.14 Mt · — TWh17-18 0.13 Mt · — TWh17-18 0.11 Mt · — TWh18-19 0.12 Mt · — TWh18-19 0.10 Mt · — TWh19-20 0.11 Mt · — TWh19-20 0.09 Mt · — TWh20-21 0.12 Mt · — TWh20-21 0.07 Mt · — TWh21-22 0.12 Mt · — TWh21-22 0.07 Mt · — TWh22-23 0.11 Mt · — TWh22-23 0.08 Mt · — TWh23-24 0.11 Mt · — TWh23-24 0.07 Mt · — TWh24-25 0.11 Mt · — TWh24-25 0.08 Mt · — TWh25-26 0.11 Mt · — TWh25-26 0.09 Mt · — TWh | ||||||
| PGNiG TERMIKA Energetyka Przemysłowa S.A.O Pniówek | Not stated (no GEM link) | 0.08 | — | — | No date ⓘ | |
| 13-14 0.08 Mt · — TWh14-15 0.07 Mt · — TWh15-16 0.08 Mt · — TWh16-17 0.07 Mt · — TWh17-18 0.08 Mt · — TWh18-19 0.08 Mt · — TWh19-20 0.07 Mt · — TWh20-21 0.08 Mt · — TWh21-22 0.08 Mt · — TWh22-23 0.07 Mt · — TWh23-24 0.07 Mt · — TWh24-25 0.07 Mt · — TWh25-26 0.08 Mt · — TWh | ||||||
| ELEKTROCIEPŁOWNIA ELBLĄG | Not stated (no GEM link) | 0.07 | — | — | No date ⓘ | |
| 13-14 0.28 Mt · — TWh14-15 0.25 Mt · — TWh15-16 0.23 Mt · — TWh16-17 0.24 Mt · — TWh17-18 0.21 Mt · — TWh18-19 0.26 Mt · — TWh19-20 0.22 Mt · — TWh20-21 0.17 Mt · — TWh21-22 0.12 Mt · — TWh22-23 0.11 Mt · — TWh23-24 0.05 Mt · — TWh24-25 0.06 Mt · — TWh25-26 0.07 Mt · — TWh | ||||||
| Kalisz power station | Gas & liquid fuels | 0.04 | — | — | No date ⓘ | |
| 13-14 0.06 Mt · — TWh14-15 0.06 Mt · — TWh15-16 0.06 Mt · — TWh16-17 0.06 Mt · — TWh17-18 0.06 Mt · — TWh18-19 0.06 Mt · — TWh19-20 0.06 Mt · — TWh20-21 0.06 Mt · — TWh21-22 0.07 Mt · — TWh22-23 0.06 Mt · — TWh23-24 0.05 Mt · — TWh24-25 0.04 Mt · — TWh25-26 0.04 Mt · — TWh | ||||||
| PGNiG TERMIKA Energ.Przemysł.S.A. Oddział Racibórz | Not stated (no GEM link) | 0.03 | — | — | No date ⓘ | |
| 13-14 0.06 Mt · — TWh14-15 0.04 Mt · — TWh15-16 0.05 Mt · — TWh16-17 0.05 Mt · — TWh17-18 0.05 Mt · — TWh18-19 0.05 Mt · — TWh19-20 0.04 Mt · — TWh20-21 0.04 Mt · — TWh21-22 0.05 Mt · — TWh22-23 0.04 Mt · — TWh23-24 0.03 Mt · — TWh24-25 0.03 Mt · — TWh25-26 0.03 Mt · — TWh | ||||||
| PGNiG TERMIKA Energetyka PrzemysłowaS.A. Oddz.Żory | Not stated (no GEM link) | 0.03 | — | — | No date ⓘ | |
| 13-14 0.05 Mt · — TWh14-15 0.04 Mt · — TWh15-16 0.04 Mt · — TWh16-17 0.03 Mt · — TWh17-18 0.03 Mt · — TWh18-19 0.04 Mt · — TWh19-20 0.03 Mt · — TWh20-21 0.03 Mt · — TWh21-22 0.04 Mt · — TWh22-23 0.03 Mt · — TWh23-24 0.03 Mt · — TWh24-25 0.03 Mt · — TWh25-26 0.03 Mt · — TWh | ||||||
| PGNiG TERMIKA Energetyka PrzemysłowaS.A. Wodzisław | Not stated (no GEM link) | 0.03 | — | — | No date ⓘ | |
| 13-14 0.04 Mt · — TWh14-15 0.03 Mt · — TWh15-16 0.03 Mt · — TWh16-17 0.03 Mt · — TWh17-18 0.03 Mt · — TWh18-19 0.03 Mt · — TWh19-20 0.03 Mt · — TWh20-21 0.03 Mt · — TWh21-22 0.04 Mt · — TWh22-23 0.03 Mt · — TWh23-24 0.03 Mt · — TWh24-25 0.03 Mt · — TWh25-26 0.03 Mt · — TWh | ||||||
| TŁOCZNIA GAZU | Not stated (no GEM link) | 0.03 | — | — | No date ⓘ | |
| 13-14 0.03 Mt · — TWh14-15 0.02 Mt · — TWh15-16 0.02 Mt · — TWh16-17 0.02 Mt · — TWh17-18 0.03 Mt · — TWh18-19 0.03 Mt · — TWh19-20 0.03 Mt · — TWh20-21 0.03 Mt · — TWh21-22 0.02 Mt · — TWh22-23 0.02 Mt · — TWh23-24 0.02 Mt · — TWh24-25 0.02 Mt · — TWh25-26 0.03 Mt · — TWh | ||||||
| Ciepłownia w Żychlinie | Not stated (no GEM link) | 0.01 | — | — | No date ⓘ | |
| 13-14 0.02 Mt · — TWh14-15 0.02 Mt · — TWh15-16 0.02 Mt · — TWh16-17 0.01 Mt · — TWh17-18 0.02 Mt · — TWh18-19 0.02 Mt · — TWh19-20 0.01 Mt · — TWh20-21 0.01 Mt · — TWh21-22 0.02 Mt · — TWh22-23 0.01 Mt · — TWh23-24 0.01 Mt · — TWh24-25 0.01 Mt · — TWh25-26 0.01 Mt · — TWh | ||||||
| No longer reporting under this company | ||||||
| PGNiG Termika Energetyka Przemysłowa O Moszczenica | Not stated (no GEM link) | 0.02 | — | 24 | Retired / sold ⓘ | |
| 13-14 0.11 Mt · — TWh14-15 0.12 Mt · — TWh15-16 0.14 Mt · — TWh16-17 0.09 Mt · — TWh17-18 0.08 Mt · — TWh18-19 0.07 Mt · — TWh19-20 0.04 Mt · — TWh20-21 0.04 Mt · — TWh21-22 0.04 Mt · — TWh22-23 0.04 Mt · — TWh23-24 0.04 Mt · — TWh24-25 0.02 Mt · — TWh | ||||||
| Plock power station | Gas & liquid fuels | 2.65 | — | 21 | Retired / sold ⓘ | |
| 13-14 2.75 Mt · — TWh14-15 2.56 Mt · — TWh15-16 2.91 Mt · — TWh16-17 2.94 Mt · — TWh17-18 0.00 Mt · — TWh17-18 2.90 Mt · — TWh18-19 0.74 Mt · — TWh18-19 2.65 Mt · — TWh19-20 1.46 Mt · — TWh19-20 2.59 Mt · — TWh20-21 1.46 Mt · — TWh20-21 2.61 Mt · — TWh21-22 0.95 Mt · — TWh21-22 2.65 Mt · — TWh | ||||||
| Plock power station | Gas & liquid fuels | 0.95 | — | 21 | Retired / sold ⓘ | |
| 13-14 2.75 Mt · — TWh14-15 2.56 Mt · — TWh15-16 2.91 Mt · — TWh16-17 2.94 Mt · — TWh17-18 0.00 Mt · — TWh17-18 2.90 Mt · — TWh18-19 0.74 Mt · — TWh18-19 2.65 Mt · — TWh19-20 1.46 Mt · — TWh19-20 2.59 Mt · — TWh20-21 1.46 Mt · — TWh20-21 2.61 Mt · — TWh21-22 0.95 Mt · — TWh21-22 2.65 Mt · — TWh | ||||||
Closure: ≤2030 · 2031-40 · later ·
↻ date moved · click a row for annual figures
+ 2 small plants (<0.01 Mt, no closure date)
Wierzchowice Ugs power station · CIEPŁOWNIA WOLA
Download the data
CSV files · CC BY 4.0 ⓘ
Please cite: Open Assets (University of Oxford & The University of Queensland). Power plant emissions and closures, version 2026-10. https://open-assets.ai/power/
- README.md citation, licences, sources, column notes
- power_company_series.csv CC BY 4.0 ⓘ
- power_plants.csv CC BY 4.0 ⓘ
- power_plant_annual.csv CC BY 4.0 ⓘ
- power_company_series_us.csv CC BY 4.0 ⓘ
- power_plants_us.csv CC BY 4.0 ⓘ
- power_plant_annual_us.csv CC BY 4.0 ⓘ
- power_company_series_eu.csv CC BY 4.0 ⓘ
- power_plants_eu.csv CC BY 4.0 ⓘ
- power_closure_events.csv CC BY 4.0 ⓘ
- power_aggregate.csv CC BY 4.0 ⓘ
Sources & licences
- European Commission, EU ETS verified emissions per installation (Union Registry) (Verified emissions 2008-2025 and compliance data, October 2026). European installation emissions (power and heat), 2013-2025. CC BY 4.0
- UK Emissions Trading Registry, UK ETS registry compliance report (2021-2025). UK installation emissions from 2021. Open Government Licence v3.0
- ENTSO-E Transparency Platform, Actual generation output per generation unit (16.1.A) (2015-2025, downloaded October 2026). Company net generation and intensity in Europe (aggregated from units of 100 MW or more). ENTSO-E Transparency Platform Terms of Use (source cited; company totals only, unit data not republished)
- Global Energy Monitor, Global Coal Plant Tracker; Global Oil and Gas Plant Tracker (July 2026 (coal), August 2026 (oil and gas)). Plant owners and equity shares (equity-share basis). CC BY 4.0
- Open Assets data: CC BY 4.0. Company targets (Net Zero Tracker, CC BY-NC 4.0) and TPI data are shown on the site for comparison but are not part of the downloadable data. Cite as: Open Assets (University of Oxford & The University of Queensland). Power plant emissions and closures, version 2026-10. https://open-assets.ai/power/